Publisher: Guangzhou Chuangya Acoustics Technology Co., Ltd. Time: 5/3/2023 9:30:35 AM
The art museum project broke ground in April 2019 and was completed on time and below budget. The exterior wall is decorated with black bricks - different from other buildings in the park, it is impressive at first glance. The photos show that a large number of sandstone sound-absorbing boards were used on the wall during the interior decoration, where a soundproof and shock-absorbing cushion layer was laid on the ground. It includes a multi-functional hall that will allow the art museum to hold various types of activities.
(Click on the above image to learn about sandstone sound-absorbing panels)
Sandstone sound-absorbing board surface sprayed with sound-absorbing layer can achieve seamless effect